Donate using PayPal

Tags: b1102

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Ely.
Go to the national CycleStreets photo listings for photos beyond.

New crossing of B1102 near Anglesey Abbey. The refuge appears to be approximately 1.8 - 2 metres deep. Although this seems to be the same length as a typical bicycle, you would have to be extraordinarily confident to try and wait in this re ... [more]

Looking at the end of the new pathway from across the road, Anglesey Abbey-side. Somehow an informal uncontrolled crossing is going to be installed here. There's no possible way the refuge is going to be large enough for a bicycle much less ... [more]

Unfinished end of the pathway across from Anglesey Abbey. Not yet surfaced.

Field-edge pathway, separated from highway by hedge. Will be very nice when done. Not yet surfaced.

End of hedge separated portion of pathway - connection unfinished - machinery still in place.

Beginning of on-highway verge-separated section of path - the connection between the hedge-separated portion and here is not yet complete.

New pathway, in this section there is a 0.5m-wide verge. Less separation than standards call for but certainly much better than what we had before (nothing), and connects to very nice hedge-separated pathways.

Subsiding shared use cycle path alongside B1102 between Lode and Longmeadow. See also #23790.

Subsiding shared use cycle path alongside B1102 between Lode and Longmeadow. See also #23791.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://ely.cyclestreets.net/photomap/tags/b1102/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.